jsheradin,
@jsheradin@kbin.social avatar

It's pretty common for a CMM to be in its own climate controlled room. Parts will be placed in the room and allowed to reach reference temperature for a several hours prior to measurement.

On production lines you usually skip the absolute measurement of a CMM and use go/no-go gauges. One should fit, one should not. They'll be made of a material with similar thermal expansion coefficients as your parts. As long as they've both been sitting around for a while they'll be at the same temp. They'll have expanded or contracted the same amount from reference so their relationship of go/no-go will still hold true.

The whole field of metrology is a never ending rabbit hole - really interesting the more you get into it.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • random
  • uselessserver093
  • Food
  • aaaaaaacccccccce
  • [email protected]
  • test
  • CafeMeta
  • testmag
  • MUD
  • RhythmGameZone
  • RSS
  • dabs
  • Socialism
  • KbinCafe
  • TheResearchGuardian
  • Ask_kbincafe
  • oklahoma
  • feritale
  • SuperSentai
  • KamenRider
  • All magazines