someguy3,

Geotech analysis (this is an earthquake zone), multiple route options with associated costs (read: lots of math), the required community info sessions and feedback (repeat that a few times), route alterations from the politics, eventual route selection, then actual detailed design can begin on structures, electrical systems, etc (read: lots of math).

  • All
  • Subscribed
  • Moderated
  • Favorites
  • random
  • uselessserver093
  • Food
  • aaaaaaacccccccce
  • [email protected]
  • test
  • CafeMeta
  • testmag
  • MUD
  • RhythmGameZone
  • RSS
  • dabs
  • Socialism
  • KbinCafe
  • TheResearchGuardian
  • Ask_kbincafe
  • oklahoma
  • feritale
  • SuperSentai
  • KamenRider
  • All magazines