Geotech analysis (this is an earthquake zone), multiple route options with associated costs (read: lots of math), the required community info sessions and feedback (repeat that a few times), route alterations from the politics, eventual route selection, then actual detailed design can begin on structures, electrical systems, etc (read: lots of math).